Reservoir project reaching final stages

 

MINERAL COUNTY — The San Luis Valley Irrigation District (SLVID) is anticipating moving its Rio Grande Reservoir expansion project into the final design stage by “late fall or early 2010,” according to SLVID Supervisor Travis Smith.
The district is currently consulting with the Colorado Division of Water Resources, the District 20 Water Commissioners, the Rio Grande Water Users Association, the Nature Conservancy and Trout Unlimited on the expansion project.

http://www.mineralcountyminer.com/V2_news_articles.php?heading=0&page=72&story_id=779

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: